Engineering Design Review
Client | End User | Country | Qty | Equipment | Supply Scope | Delivery |
---|---|---|---|---|---|---|
Trans Gulf Port cranes (TGPC) | DP word | U.A.E | 10 | STS | Engineering Design | 2013.02—2014.06 |
Trans Gulf Port cranes (TGPC) | DP word | U.A.E | 25 | RMG | Engineering Design | 2013.02—2014.06 |
Trans Gulf Port cranes (TGPC) | DP word | U.A.E | 4 | STS | Engineering Design | 2013.02—2014.06 |
Gulf Piping Company (GPC) | Gulf Drilling international GDI | U.A.E | 1 | JACK UP Barge | Design Review, Quality Supervision | 2012.07—2014.04 |
Kaliningrad | Baltkran | Russia | 1 | RTG | Engineering Design, Electrical system integration | 2012.06—2014.07 |
Xiamen Port | Xiamen Port | China | 2 | STS | Engineering Design Review, Supervision | 2012.08 |
Retrofit & Inspection
Client | End User | Country | Qty | Equipment | Supply Scope | Delivery |
Pelindo 4 | Makassar port | Indonesia | 1 | STS | Mechanical electric control retrofit | 2014.04—2014.11 |
Pelindo 4 | Makassar port | Indonesia | 2 | RTG | Mechanical electric control retrofit | 2014.04—2014.11 |
Pelindo 4 | Makassar port | Indonesia | 1 | STS | Installation of Elevator | 2014.07—2015.03 |
Xiamen Port | Xiamen international container terminal | China | 1 | RTG | Gantry Wheel fork mechanical design, retrofit and installation | 2014.12—2015.04 |
Xiamen Port | XiangYu Terminal | China | 1 | RTG | Gantry equalizing beam mechanical design, retrofit and installation | 2015.03—2015.05 |
Xiamen Port | Xiamen international container terminal | China | 1 | RTG | Gantry Wheel fork mechanical design, retrofit and installation | 2015.02—2015.09 |
Xiamen Port | HaiTian Terminal | China | 1 | RMG | Trolley travel driving mechanical and electrical retrofit | 2015.03—2015.09 |